Seyouf, Mansheya, Sharki Water Treatment Stations

  • Total initial contract value ≈ 65’000’000 E.P.
  • Electro-mech. contract value ≈ 55’000’000 E.P.  
  • Civil & Finishing contract value (with additional works) ≈ 12’000’000 E.P.
  • Location: Alexandria – Client: Alexandria water treatment company

Project Description: Supply, Engineering, installation, Commissioning, Startup, and Training of the following:

  • 4 Complete multi-stage Scrubber systems  (Evoqua, Made in USA)
  • 4 Complete chlorine buildings (Control Matik, Made in E.U.)
  • Complete Civil & Finishing works for New Seyouf Building
  • 4 Complete multi-stage Scrubber systems
  • Brand: Evoqua
  • Made in USA
  • 4 Chlorine buildings,  Control Matik made in E.U.
  • including but not limited to:
  • 20 Evaporators 200 kg/hr
  • 73 Cabinets 80 to 120 kg/hr
  • 73 Ejectors 80 to 120 kg/hr
  • 20 Vacuum regulators 200 kg/hr
  • 16 Electric PRV 200 kg/hr
  • 15 Safety Valves
  • 4 Electric switchover
  • 16 Filters
  • 4 Cranes
  • 21 Expansion Chamber with rupture disc
  • 33 Detectors with 2 sensors & battery
  • 4 Electric Panels (Schneider Type Tested)
  • 20 Booster Pumps
  • Spare parts & maintenance kits for all equipment – headers & connections – 12 km. of injection pipes 6” – Lighting equipment.
  • Complete Civil & Finishing works for New Seyouf Buildin

Baten Water treatment Station – KSA

Baten
Water treatment Station - KSA

Baten Water treatment Station – KSA

  • Location: King Khaled military city, KSA.

  • Client: Atwar Al Koun

  • Project Description: supply, installation and commissioning of automatic injection system + complete neutralization system for chlorine building.

  • Equipment: Archer made in USA.

Dar Al Salam Water Treatment Station

Dar Al Salam
Water Treatment Station

  • Location: Sohag.

  • Client: NAPWS (National Authority for Potable Water & Sewage).

  • Main contractor: Arab Contactors.

  • Project Description: supply, installation and commissioning of chlorination building, chemicals buildings and laboratory sampling system.

Chlorination building equipment included:

  • Automatic and manual cabinets 40 & 60 kg/hr – ejectors – switchover – analyzers – recorders controllers – vacuum regulators – Detectors with 4 probes – pressure reducing valves – pressure relief valves – filters – electric distribution panel.
  • Locally manufactured equipment: header and flexible connections – cylinder lifting bar – Cylinder trunions.
  • Other equipment: ton cylinders – crane – booster pumps – ventilation system.
  • Neutralization system: Neutralization tower – air blowers – caustic sauda pumps – mixer for sauda tank – sprinkling system

  • Safety equipment: breathing apparatus – respiration masks – safety kit for cylinder – safety suit – safety shower – safety signs.

Chemicals building equipment:

  • Alumn sulphate dosing system: Double head metering pumps with discharge = 3400 l/hr with accessories (dampers, relief valves…).

  • Electric slow mixers with S.S. shaft (2.4 m length) and impeller locally manufactured.

  • Chemicals elevator capacity 2 ton.

  • Electric distribution boards.

  • Platform scales.

  • Ventilation system.

  • Dissolving trays.

  • Level meters.

Laboratory sampling system

  •  

El Fostat Water Treatment Station

El Fostat
Water Treatment Station

El Fostat Water Treatment Station

  • Scope: 5 Automatic closing systems for chlorine rooms doors

  • System is closed automatically at chlorine detector signal alarm

  • Sym was also installed in Road El Farag water station as pilot project for autostematic system (TI reserves all its rights for intellectual property owner ship)

New Capital water lifting station chlorination building