Location: Sohag.
Client: NAPWS (National Authority for Potable Water & Sewage).
Main contractor: Arab Contactors.
Project Description: supply, installation and commissioning of chlorination building, chemicals buildings and laboratory sampling system.
Chlorination building equipment included:
Neutralization system: Neutralization tower – air blowers – caustic sauda pumps – mixer for sauda tank – sprinkling system
Safety equipment: breathing apparatus – respiration masks – safety kit for cylinder – safety suit – safety shower – safety signs.
Chemicals building equipment:
Alumn sulphate dosing system: Double head metering pumps with discharge = 3400 l/hr with accessories (dampers, relief valves…).
Electric slow mixers with S.S. shaft (2.4 m length) and impeller locally manufactured.
Chemicals elevator capacity 2 ton.
Electric distribution boards.
Platform scales.
Ventilation system.
Dissolving trays.
Level meters.
Laboratory sampling system