Dar Al Salam
Water Treatment Station

  • Location: Sohag.

  • Client: NAPWS (National Authority for Potable Water & Sewage).

  • Main contractor: Arab Contactors.

  • Project Description: supply, installation and commissioning of chlorination building, chemicals buildings and laboratory sampling system.

Chlorination building equipment included:

  • Automatic and manual cabinets 40 & 60 kg/hr – ejectors – switchover – analyzers – recorders controllers – vacuum regulators – Detectors with 4 probes – pressure reducing valves – pressure relief valves – filters – electric distribution panel.
  • Locally manufactured equipment: header and flexible connections – cylinder lifting bar – Cylinder trunions.
  • Other equipment: ton cylinders – crane – booster pumps – ventilation system.
  • Neutralization system: Neutralization tower – air blowers – caustic sauda pumps – mixer for sauda tank – sprinkling system

  • Safety equipment: breathing apparatus – respiration masks – safety kit for cylinder – safety suit – safety shower – safety signs.

Chemicals building equipment:

  • Alumn sulphate dosing system: Double head metering pumps with discharge = 3400 l/hr with accessories (dampers, relief valves…).

  • Electric slow mixers with S.S. shaft (2.4 m length) and impeller locally manufactured.

  • Chemicals elevator capacity 2 ton.

  • Electric distribution boards.

  • Platform scales.

  • Ventilation system.

  • Dissolving trays.

  • Level meters.

Laboratory sampling system

  •