Our Recent Projects

Egestas fringilla phasellus faucibus scelerisque eleifend donec pretium pellentesque dignissim enim sit amet venenatis urna cursus eget eget arcu dictum varius duis maecenas sed.

Supply of chlorination equipment for Alexandria WTC

  • Client: Alexandria water treatment company.
  • Project Description: supply of chlorination equipment:

    – 34  Complete chlorination system 40, 60 & 80 Kg/hr (cabinet with  differential pressure regulator – vacuum regulator – ejector – chlorine line filter – header – accessories – Spare parts for 5 years of operations).

    Training trip of 2 engineers from Alexandria WTC at Control Matik factory in Slovenia

Alex8

Seyouf, Mansheya, Sharki Water Treatment Stations

  • Total initial contract value ≈ 65’000’000 E.P.
  • Electro-mech. contract value ≈ 55’000’000 E.P.  
  • Civil & Finishing contract value (with additional works) ≈ 12’000’000 E.P.
  • Location: Alexandria – Client: Alexandria water treatment company

6f65654d-37e1-42fc-883b-95a8387ed857


266311888_1922618741233531_6288588073824739749_n


268712125_446699070288176_6103027487573192024_n


Baten Water treatment Station – KSA

Baten Water treatment Station – KSA

Baten Water treatment Station

Baten Water treatment Station – KSA

Baten Water treatment Station – KSA

Baten Water treatment Station – KSA

  • Location: King Khaled military city, KSA.
  • Client: Atwar Al Koun
  • Project Description: supply, installation and commissioning of automatic injection system + complete neutralization system for chlorine building.
  • Equipment: Archer made in USA.

Baten1


Baten2


Baten3


Baten4

Dar Al Salam Water Treatment Station

Dar Al Salam Water Treatment Station

  • Location: Sohag.
  • Client: NAPWS (National Authority for Potable Water & Sewage).
  • Main contractor: Arab Contactors.
  • Project Description: supply, installation and commissioning of chlorination building, chemicals buildings and laboratory sampling system.

Chlorination building equipment included:

  • Automatic and manual cabinets 40 & 60 kg/hr – ejectors – switchover – analyzers – recorders controllers – vacuum regulators – Detectors with 4 probes – pressure reducing valves – pressure relief…

El Fostat Water Treatment Station

El Fostat Water Treatment Station

El Fostat Water Treatment

El Fostat Water Treatment Station

El Fostat Water Treatment Station

El Fostat Water Treatment Station

  • Scope: 5 Automatic closing systems for chlorine rooms doors
  • System is closed automatically at chlorine detector signal alarm
  • Sym was also installed in Road El Farag water station as pilot project for autostematic system (TI reserves all its rights for intellectual property owner ship)

New Capital water lifting station chlorination building

Subscribe to Our Newsletter

Suspendisse potenti Phasellus euismod libero in neque.